DIPLOMA TRAINEES Required in NTPC 24000PM

230

DIPLOMA TRAINEES Required in NTPC 24000PM – 70 Post is available for ALL India Location. Applications are invited from energetic young Diploma Engineers with brilliant academic
record to join this organization for Pakri Barwadih Coal Mining Project (Jharkhand), Chatti Bariatu Coal Mining Project (Jharkhand), Keredari Coal Mining Project (Jharkhand), Dulanga Coal Mining Project (Odisha) and Talaipalli Coal Mining Project (Chhattisgarh) under Coal Mining Region of NTPC Limited. This information brought to you by the www.Sarkari-Naukri1.com website.

Essential Qualifications

DisciplineQualification*
MiningFull time regular Diploma in Mining/ Mining & Mine Surveying Engineering
with minimum 70% marks.
ElectricalFull time regular Diploma in Electrical / Electrical & Electronics
Engineering with minimum 70% marks.
MechanicalFull time regular Diploma in Mechanical/ Production Engineering with
minimum 70% marks.
Mine SurveyFull time regular Diploma in Mine Survey/ Diploma in Mining Engineering
/Diploma in Mining & Mine Surveying with minimum 70% marks.

Relaxation for SC/ST/PwBD (where vacancies are identified): Pass marks
Relaxation for Land Oustees: 50% marks.
Advt.No: CM/Ranchi: 01/2020

SELECTION PROCESS:

Eligible candidates will have to undergo 2 stages of Online Test (Computer Based Test).
st 1 stage online test: In first stage, Online Aptitude Test (120 multiple choice questions)
covering General English, Quantitative aptitude & Reasoning will be conducted. The
duration of the test will be 2 hours. Each question carries 1 mark and 0.25 marks will be
deducted for wrong answer. There is qualifying marks (40% marks in case of
General/EWS category and 30% in case of SC/ST/OBC/PwBD candidates). The
candidates will be shortlisted @ 1:10 for 2nd stage Online Test (Technical). There will be
no weightage to online aptitude test in final selection.
nd 2 stage Online Test: In 2nd stage, Online Technical Test (120 multiple choice
questions) in respective discipline will be conducted. The duration of the test will be 2
hours. Each question carries 1 mark and 0.25 marks will be deducted for wrong answer.
There is qualifying marks (40% marks in case of General category and 30% in case
of SC/ST/OBC/PwBD candidates). Offer of appointment may be issued based on merit.
No skill test will be conducted.

Age

Please check with adv.

Pay Scale

will be paid a consolidated stipend of Rs. 24,000/- per month.

Important Date & How To Apply

Eligible candidates have to apply through online registration system of NTPC only.
To apply visit: w ww.ntpccareers.net with your valid e-mail ID. The site is functional
from 1 0.00 hours of 23.11.2020 to midnight of 12.12.2020.

Place of Posting

The Place of posting for check the adv.

Important link

About NTPC Overview

DIPLOMA TRAINEES Required in NTPC 24000pm
Govt Job

NTPC is India’s largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing green house gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilisation and coal mining as well.

NTPC became a Maharatna company in May 2010. As of January 2020, there are 10 Maharatnas CPSEs in India. NTPC is ranked No. 2 Independent Power Producer(IPP) in Platts Top 250 Global Energy Company rankings.

The total installed capacity of the company is 62,918 MW (including JVs) own stations include 24 coal based,  7 gas based, 1 Hydro 1 Wind 12 Solar and 1 Small hydro plant. Under JV, NTPC has 9 coal based, 4 gas based and 12 renewable energy projects. The capacity will have a diversified fuel mix and by 2032, non fossil fuel based generation capacity shall make up nearly 30% of NTPC’s portfolio DIPLOMA TRAINEES Required in NTPC 24000pm DIPLOMA TRAINEES Required in NTPC 24000pm.DIPLOMA TRAINEES Required in NTPC 24000pm.